Still Thinking Of Assignment Help & Grades ? Book Your Assignment At The Lowest Price Now & Secure Higher Grades! CALL US +91-9872003804
Order Now
Value Assignment Help

Sample solution for COM3006 Carry out levelling operation

How will you calculate reduced levels using the Collimation method when carrying out levelling operations?

  1. 1
  2. 2

Diploma Courses Assignment Sample

Q1:

Answer :

The collimation method consists of finding the height of the plane of collimation for each setting of the instrument and then deriving the low level of the points corresponding to the corresponding collimation scheme. Low-level calculation using the collimation method:

Q1: Define the ‘Title Panel’ of a construction drawing. How do you check a Title Panel for its latest amendment?

Answer :

The title panel is a block of information that contains information about the drawing and project. It can be found at the beginning of the drawing. It includes date, version, drawing number, site location, architect, contractor, and client and scale information. The title panel can also verify the latest amendments in the drawing. It is an essential element for filling and verification purposes. 

Q1: How are amendments mentioned on a construction drawing or document?

Answer :

We can check the title panel of the project documentation to check the latest amendments. These can be mentioned by incrementing the document’s revision number or letter. For example, the first drawing number will be FP-8E-002, while the second revision will be FP-8E-002-A, where A indicates the new revision.