Still Thinking Of Assignment Help & Grades ? Book Your Assignment At The Lowest Price Now & Secure Higher Grades! CALL US +91-9872003804
Discover the essential roles of SQL and C# in modern programming. Learn how these languages drive innovation in data man...
Revised H-1B Visa Rules Boost Opportunities for Global Talent...
Money Talks: The Influence of Corporate and Individual Contributions on Politics and Business Relations...
No Cooperation, No Business’ Trump’s Zero Tolerance Policy for His Largest Deportation Operation....

Order Now

Value Assignment Help

Free Sample for Measurement and Calculation Assignment Solutions - COM1015

If you are looking for free assignment sample for COM1015, Carry out measurements and calculations, then Value Assignment Help is the right place to get sudden help with the right context. On the other hand, if you know how to write an assignment but don't know how to present it on paper, please don't worry. VAH experts will guide you to come out of such type of confusion.

Free Sample For Subject Code COM1015

We provide students with free assignment help, free essays, free case studies, free term papers, and free homework samples so that you can see our quality before you decide on our services. We provide free references and free titles for special assignments. We provide free plagiarism report with assignments. We offer free revision on your assignments till you are satisfied. Please chat with our assignment counselor to get free assignment samples for your work.

Review our free assignment sample for "Subject code - COM1015" below – to check the quality before ordering your assignment.

What is a ratio?

A ratio is a comparison of two or more amounts. 

The ratio is three diamonds to 5 hearts.

This can be written as 3:5.

How to derive the weight formula?

The formula to calculate the weight of materials to be used in construction is:

Weight = Density x Volume(Volume = Area x Length)

What is the floor area ratio (FAR)?

The floor area ratio is the relationship between the amount of usable floor area a building has or has been permitted to have and the total land area on which the building is located.

We may determine the ratio by dividing the total or gross floor area of the building by the gross area of the lot.

Floor area ratio = (Total building floor area / Gross Lot area)

How to read a tape measure

To read a tape measure, we must first understand each black line. In general, the line length determines the measurement's length. The longest mark marks inches, labelled with large numbers (typically black). Each smaller marking represents a smaller fraction of an inch. For example, the line roughly half the length of the inch mark is 12 inches. The subsequent lowest measurement is a quarter-inch, and the length of the mark is around one-fourth of an inch. 

"Get Top Notch Assignment Help & Essay Writing Services in Academic Subjects with our VAH Assignment Experts."

What is an architect scale ruler?

A triangle architect scale has six edges; two scales—1 inch to 1 foot and 12 inches to 1 foot—are sometimes displayed on the same edge. Some sets with several rules can include as many as 16 scales. These usually are 12 inches long and come in a wide range of materials, including plastic scales, solid aluminium scales, and ones with colour-coded grooves. It is a necessary tool for architects, engineers, and constructors.

How to use a tape measure to measure things accurately

  • To acquire an exact measurement, ensure the tape is as flat on the surface as possible. Hook the pull tab on the surface's edge or press it flat to the interior of the surface.
  • Then, if the tape measure has a lock, activate it or hold the tape in place with your hand to secure it. If you are in the planning stages, mark your surface with the measurement as close to the tape marking as feasible, or record it in a notebook.
  • Slowly unlock the tape to coil back safely instead of letting it snap back in with too much force.

How to use an architect scale ruler?

Determine the scale of the architectural drawing that you are reading or producing. If a single scale were utilised for a complete sheet of plans, the scale would usually be indicated in the legend. Look for it underneath the relevant drawing; it will also specify if different scales have been used for multiple drawings on the same page.

On the ruler, locate the corresponding scale. On a triangle scale, there will most likely be two rows of numbers, one over the other. If the scale has 1/4 at one end of an edge and 1/8 at the other, the row of numbers that begins with zero closer to the 1/4 is the scale's numbers, with a 1/4 inch equating to one foot.

To measure a 4-foot wall at a specific scale, start the line at zero and draw it to the “4” mark.

On each scale, we'll see some tiny gradations to the right of zero. We can measure fractions of a foot using these fractions of an inch. For example, if we wish to draw a line that is 4.5 feet long, we should start at the midway point of the smaller gradations and work our way out until we reach the “4” mark.

"Stuck with assignment writing task? Hire PhD/MBA experts for university Assignments."

How to Use the Floor Area Ratio?

The floor area ratio of a 1,000-square-foot, one-story building on a 4,000-square-foot lot is 0.25x. A two-story building on the same property with 500 square feet on each floor would have the same floor-area-ratio value.

In other words, many have a floor area ratio of 2.0x and square footage of 1,000. In this case, a developer could erect a structure of up to 2,000 square feet. This might feature a two-story, 1,000-square-foot structure.

Consider an apartment building with a total floor area of 17,350 square feet. The total size of the property is 1.81 acres or 78,843 square feet. Therefore, the floor area ratio is 0.22x, equal to 17,350 divided by 78,843.

Why is steel weight required during construction?

The amount of steel is generally calculated from the designs using the Bar Bending Schedule (Sample Bar Bending Chart shown below). The quantity of steel delivered for the bar bending schedule is usually measured in the lengths of each dia of the bar required. Conversely, steel is always purchased or delivered by weight (kgs or Tonnes).

"If you want properly written plagiarism-free solutions from Writers, Contact us!"

  1. 1
  2. 2
Comments

No Comments

Add A Comment