Still Thinking Of Assignment Help & Grades ? Book Your Assignment At The Lowest Price Now & Secure Higher Grades! CALL US +91-9872003804
Order Now
Value Assignment Help

Sample solution for CPCCCA3002 - Carry out setting out

Identify and write mandatory steps to design construction on a steeping site.

  1. 1
  2. 2

Diploma Courses Assignment Sample

Q1:

Answer :

Steps to design construction on a steeping site:

  • Get a survey to accurately plot the contours and determine the slope of your site. 
  • Use stumps or post footings as means of support.
  • All distances between survey pegs on sloping or steep sites must be measured horizontally to eliminate any accumulated error.
  • Use an extra string line to identify the position of the boundary line n the steeping site.