Discuss the formwork rectification methods.
 

  1. 1
  2. 2

Diploma Courses Assignment Sample

Q1:

Answer :

Among the methods of rectifying the formwork are:

  • Check for defects before installing- The components should be checked for defects in the formwork. Risk assessment should be carried out when installing the components. Poor quality should be avoided when choosing components for formwork. Meet ISO standards and quality assurance to maintain the durability of the formwork.
  • Check the connections – The connections should be checked before pouring concrete into the formwork. Bolts and screws should be tightened using power tools. Fill gaps, if any, and check for cracks and sources of leakage.
  • Levelling should be done- Improper foundation may lead to leakage in the formwork. Proper levelling should be done and left for hours to stabilize; Then, the formwork should be placed and erected on the surface. Leveler can be used to check the level of the surface.
  • Designing should be done under the supervision of an architect and supervisor to minimize mistakes and risks to the construction work.