Other Assignment Sample
Q1:
Answer :
Policies and procedures/documentation |
How the policy and procedure or documentation informs or contributes to a detailed traffic analysis |
Cultural and heritage management
Environmental management
Safe work method statement (SWMS)
Geotechnical management
Hydrological and meteorological management
Incident and emergency response
Performance reviews
Quality management
Risk assessment and management
System close outs (project closure)
Work health and safety
Documentation management (and to ensure all workplace recording and reporting occurs) |
This helps to ensure that the traffic flow does not impact the culturally important sites and protects the cultural value of people and preserve any heritage or cultural site that is valuable with proper project management. Environmental management helps to reduce the impact of the traffic on the environment by proper management of the rules and regulations on the traffic for minimising the harm of vehicles on the environment. SWMS provides the guidelines for a safe working environment and analysing the risks and minimising their impacts to make sure that the traffic moves safely and they are in compliance with the safety regulations for traffic. This helps to provide the data about the soil, rock, and ground conditions for the area where the traffic construction is going to take place. It helps to make safe designs and support the structures properly and check what is suitable for the traffic on the road. This helps to ensure that the road design have good strength against the weather of the area, flood risks, water management and it can take any weather conditions and stay stable and durable. This helps to understand about the accidents and emergencies that can be caused on the traffic road and how can the design reduce the cause of the accidents and minimise the impact and be quick for the emergency response. Performance reviews helps to make sure that the traffic project is improving and has all the required essential elements which will take into account the feedbacks and makes the working better. Quality management makes sure that the road and the project has all standards of working and has accuracy of standards and the working is contributing to a quality project with best traffic analysis. Risk assessment and management helps in making analysis of possible risks and accidents that can happen in the traffic and it helps to make sure that the strategies to overcome those risks are made effectively to have a safe traffic working. Project closure helps to make sure that all objectives of the project are completed and all the goals of the traffic design are met properly. This helps to project is performed and documented properly. WHS helps to makes sure that the working of the workers is safe and under control. There are no hazards and the workers and the traffic are safe from any issues. Documentation helps to make sure that the traffic details are properly noted and they are easy to use if required with all the standards and regulations being filled properly. |
Q1: Explain each of the following traffic analysis techniques and their use in traffic analysis
Answer :
Traffic data analysis technique |
Description and use in traffic analysis |
Traffic flow
Level of service
Traffic capacity requirements
Percentages |
Traffic flow is the data which gives us information about the rate at which the traffic pass from the road.
Level of service is an indicator of the delay of traffic and queuing of incidents.
Traffic capacity requirement is the maximum capacity of the infrastructure like road. It tells about the maximum flow of the traffic which the road can take on peak hours and provide efficient service to people. Percentage is the how much the amount of traffic goes on what paths and it help to predict the future use of traffic. |